Jazan Refinery and Terminal Project

Our diverse portfolio represents decades of construction experience backed by a passion for quality, outstanding client service and the latest industry technologies.

Jazan Refinery and Terminal Project

Clients

Saudi Aramco

Main Contractor

Daewoo Engineering

Sector

Oil & Gas

City

Jazan, Saudi Arabia

About Project

The Jazan Refinery and Terminal project is a Saudi Aramco industrial facility on the Red Sea coast. Under Daewoo Engineering, Alamaat Specialised Contracting executed an assigned package of civil works, pipe rack steel erection, site fencing and temporary facilities.

The package included foundations for process equipment and pipe racks, columns and pedestals, erection of steelwork supplied by others, installation of fencing and establishment of temporary facilities for the main contractor.

Project Requirements

Equipment and pipe rack structures depend on precisely aligned concrete supports and carefully coordinated erection work. The project also required compliance with Saudi Aramco’s inspection and safety procedures. Daewoo needed foundations and the installation of supplied steel members coordinated within the construction programme.

Project Highlights

Foundations for process equipment
Pipe rack foundations, columns and pedestals
Installation of pipe rack steel structures
Fence installation
Temporary facilities for the project
Executed as subcontractor to Daewoo Engineering
Delivered as per Saudi Aramco quality and safety standards

Work Scope & Execution

Equipment foundations. The team built the foundations for the refinery’s equipment with excavation, formwork, reinforcement and concrete, to the required levels and tolerances.

Pipe rack foundations. The team constructed the pipe rack foundations, columns and pedestals, setting anchor bolts and base positions accurately to receive the steelwork.

Steel structure installation. The erection team positioned and installed the pipe rack steel structures: lifting, positioning, aligning and bolting the members supplied for the project, according to the approved drawings. The steel fabrication was by others, and our scope was the installation.

Fence installation. The team installed fencing on site to secure and define work areas, with posts, panels and gates set out and fixed to the required alignment.

Temporary facilities. We provided and set up temporary facilities for Daewoo, supporting site operations and keeping the workforce and supervision organized and safe during construction.

Quality and safety. We followed Aramco’s inspection and safety requirements on every activity, including lifting plans and permit-to-work procedures.

Coordination. Site coordination involved Daewoo’s engineers to align the civil and steel activities with the overall constructiwithin the agreed programme.

Planning a similar project? Share your drawings and scope with our team to discuss construction and specialist contracting requirements.

CONTACT US

Start Your Next Project with Confidence

Partner with a trusted contractor delivering reliable construction and infrastructure solutions across Saudi Arabia.

Quick Enquiry

Call Me Back

Download Brochure

x

Quick Enquiry

Send us a message and we will reply you within 3 hours by email.

    x

    Call Me Back

    Send us a message and we will reply you within 3 hours by email.

      x

      Send Email Us

      Send us a message and we will reply you within 3 hours by email.