SABIC Technology Center Project

Lead

Mohammad Hassan

Location

Jubail – KSA

Contractor Name

Carrier

status

Completed in 2018

Augmentation of HVAC System

1,460 TR Chiller and DX Units Installation

Shan TAB was engaged for the augmentation of the existing HVAC system at the SABIC Technology Center in Jubail, supporting the expansion of cooling capacity for critical research and technology operations. The project required careful integration of new systems into an operational facility without disrupting ongoing activities.

Features.

Scope of Work
The scope included the supply & Installation of Air-Cooled Liquid Chillers Air Handling Units, Pumps, Central Split DX Unit with including all related Civil and Electrification Work. . Shan TAB coordinated closely with the client and project stakeholders to ensure compatibility with existing systems. The project was executed in partnership with Carrier Saudi Service, ensuring manufacturer-aligned installation and performance standards. Comprehensive Testing, Adjusting, and Balancing activities were carried out to validate airflow, water flow, and system performance.
Technical Highlights
The HVAC augmentation was designed to enhance cooling reliability and operational flexibility. New chillers and DX units were integrated with existing electrical switchgear and control systems. Performance testing confirmed stable operation under varying load conditions, while TAB procedures ensured balanced distribution across all served areas. All work was completed in line with industry standards and site-specific technical requirements.
Project Impact
The completed augmentation significantly improved the cooling capacity and resilience of the SABIC Technology Center. Shan TAB’s structured approach ensured seamless system integration, improved thermal comfort, and long-term operational stability. The project delivered a robust HVAC solution capable of supporting SABIC’s advanced research and technology functions with verified performance and documented commissioning results.
SABIC 2

Project Teams

Project Manager
Senior Mechanical Engineer (HVAC)
Senior MEP Engineer (HVAC)
Site MEP Coordinator
Muhammad Fahad
Imdad Azeem
Arnold McAssey
Qseem Ali

Customers talk about us

PREVIOUS PROJECT
NEXT PROJECT
Select the fields to be shown. Others will be hidden. Drag and drop to rearrange the order.
  • Image
  • SKU
  • Rating
  • Price
  • Stock
  • Availability
  • Add to cart
  • Description
  • Content
  • Weight
  • Dimensions
  • Additional information
Click outside to hide the comparison bar
Compare