• HVAC System
  • TAB
  • TAB Services
Our Projects

Assessment of HVAC System Project – KJO Hospital

Lead

Mohammad Hassan

Location

Jeddah, Saudi Arabia

Contractor Name

KAU

status

Completed in 2020

HVAC System Assessment & TAB Services

Project Overview

Shan International was appointed to carry out a comprehensive HVAC system assessment at KJO Hospital in Khafji, a critical healthcare facility requiring reliable environmental control. The objective of the project was to evaluate the existing HVAC system performance, identify operational deficiencies, and verify compliance with healthcare ventilation and comfort requirements.

Project Highlights

Scope of Work
The scope included a detailed inspection and assessment of the hospital’s HVAC systems, covering air distribution, ventilation effectiveness, and overall system condition. Shan International performed Testing, Adjusting, and Balancing (TAB) activities to measure airflow rates, temperature consistency, and pressure relationships across patient areas, clinical zones, and support spaces. The assessment also focused on identifying design gaps, operational inefficiencies, and areas requiring corrective action.
Technical Highlights
The HVAC assessment was conducted using calibrated instruments and established TAB procedures in line with recognized industry standards. Special attention was given to airflow balance, indoor air quality considerations, and system responsiveness under operational loads. The evaluation provided clear performance data and practical recommendations to enhance reliability, energy efficiency, and occupant
Project Impact
The assessment enabled KJO Hospital to gain a clear understanding of its HVAC system performance and operational health. Shan International’s findings supported informed decision-making for system optimization, maintenance planning, and future upgrades. The project contributed to improved environmental conditions, enhanced patient comfort, and sustained HVAC performance within a healthcare
KJO Hospital

Project Teams

Project Manager
Senior Mechanical Engineer (HVAC)
Senior MEP Engineer (HVAC)
Site MEP Coordinator
Muhammad Fahad
Imdad Azeem
Arnold McAssey
Qseem Ali

Customers talk about us

PREVIOUS PROJECT
NEXT PROJECT
Select the fields to be shown. Others will be hidden. Drag and drop to rearrange the order.
  • Image
  • SKU
  • Rating
  • Price
  • Stock
  • Availability
  • Add to cart
  • Description
  • Content
  • Weight
  • Dimensions
  • Additional information
Click outside to hide the comparison bar
Compare