- HVAC Commissioning
- HVAC Installation
- HVAC System
Our Projects
SABIC Technology Center Project
Lead
Mohammad Hassan
Location
Jubail – KSA
Contractor Name
Carrier
status
Completed in 2018
Augmentation of HVAC System
1,460 TR Chiller and DX Units Installation
Shan TAB was engaged for the augmentation of the existing HVAC system at the SABIC Technology Center in Jubail, supporting the expansion of cooling capacity for critical research and technology operations. The project required careful integration of new systems into an operational facility without disrupting ongoing activities.
Features.
Scope of Work
The scope included the supply & Installation of Air-Cooled Liquid Chillers Air Handling Units, Pumps, Central Split DX Unit with including all related Civil and Electrification Work. . Shan TAB coordinated closely with the client and project stakeholders to ensure compatibility with existing systems. The project was executed in partnership with Carrier Saudi Service, ensuring manufacturer-aligned installation and performance standards. Comprehensive Testing, Adjusting, and Balancing activities were carried out to validate airflow, water flow, and system performance.
Technical Highlights
The HVAC augmentation was designed to enhance cooling reliability and operational flexibility. New chillers and DX units were integrated with existing electrical switchgear and control systems. Performance testing confirmed stable operation under varying load conditions, while TAB procedures ensured balanced distribution across all served areas. All work was completed in line with industry standards and site-specific technical requirements.
Project Impact
The completed augmentation significantly improved the cooling capacity and resilience of the SABIC Technology Center. Shan TAB’s structured approach ensured seamless system integration, improved thermal comfort, and long-term operational stability. The project delivered a robust HVAC solution capable of supporting SABIC’s advanced research and technology functions with verified performance and documented commissioning results.
Project Teams
Project Manager
Senior Mechanical Engineer (HVAC)
Senior MEP Engineer (HVAC)
Site MEP Coordinator
Muhammad Fahad
Imdad Azeem
Arnold McAssey
Qseem Ali
Customers talk about us
Mohammad Barakat
Business Development Manager
We were very pleased with the service you all provided last time for the testing and balancing and the work and the engineers were Certified and they knew how to complete the work in required time duration. You will definitely have us as a repeat customer as soon as the opportunity comes up.
Hamdy Mahmoud Saad
Hadi Hammam contracting Manager
I want to thank Shan International for Equipment Rental and HVAC solution Provider. From the outset the support and assistance I received was to notch. For me personally, the technical assistance and personal attention I received from Shan International was superb. They are always available to assist with any related issues, and was always extremely professional, patient, and gracious when resolving problems. I will certainly be recommending Shan International to my colleagues and peers. Thank you again for providing excellent service and support
Abdul Samad
AGC Zamil
Shan International (and the rest of team) are probably the most responsive I’ve ever worked with, especially when it comes to after hours and last-minute requests. You guys go above and beyond for me and I really do appreciate it! I recommend you guys to everyone. Installation rectification testing and Commissioning work are outstanding and it was all supervised under a Certified Engineer. Thanks for all you do!!
PREVIOUS PROJECT
Temporary Facility Infrastructure Development
NEXT PROJECT