Our Projects

IST Aramco District Cooling Project

  • District Cooling
  • HVAC System
  • MEP Services
  • Retrofitting/Retro-Commissioning
  • TAB Services
Lead

Mohammad Hassan

Location

Dhahran, KSA

Budget

305,000.00 USD

Contractor Name

Saudi Aramco

status

Completed in 2012

Aramco Facilities – Dhahran, Saudi Arabia

18,000 Tons Cooling System Diversion to DCP Dhahran

Shan Intl. was selected to support the IST Aramco District Cooling Project at Aramco’s high-security facilities in Dhahran. This major infrastructure upgrade required the disconnection of an existing 18,000-ton cooling system and the seamless diversion of the network to the Dhahran District Cooling Plant (DCP). The project demanded precise engineering, detailed planning, and strict adherence to Aramco standards.

Features.

Scope of Work
Disconnect three Plant
Room and Connect building Piping systems to Energy Thermal Station (ETS). its Include construction of Valve Chambers. Pipe Sizes 24 inches to 52 inches under Ground and Above Ground.
Technical Highlights
- 18,000 Tons of connected cooling capacity migrated to a new district cooling source.
- Zero operational disruption during transfer to ensure uninterrupted cooling for sensitive Aramco facilities.
- High-capacity chilled water pipeline realignment with pressure and flow optimization.
- TAB and performance validation following NEBB-aligned methodologies.
- Enhanced system reliability and improved energy efficiency through centralized cooling integration.
Project Impact
This diversion project significantly improved cooling system performance and operational resilience across Aramco facilities in Dhahran. By connecting to the District Cooling Plant, the facility benefits from enhanced efficiency, reduced maintenance requirements, and a more sustainable energy footprint. Shan TAB’s expertise ensured a safe, seamless, and compliant transition for one of the region’s largest cooling infrastructures.
dhahran-dcp-shan international

Project Teams

MEP Project Manager
Senior Mechanical Engineer (HVAC)
Senior MEP Engineer (HVAC)
Site MEP Coordinator
Muhammad Fahad
Imdad Azeem
Arnold McAssey
Qseem Ali

Customers talk about us

PREVIOUS PROJECT
NEXT PROJECT
Select the fields to be shown. Others will be hidden. Drag and drop to rearrange the order.
  • Image
  • SKU
  • Rating
  • Price
  • Stock
  • Availability
  • Add to cart
  • Description
  • Content
  • Weight
  • Dimensions
  • Additional information
Click outside to hide the comparison bar
Compare